📋
Basic Information
Model NO.F1-1000U
TypeAMR (Autonomous Mobile Robot)
Load Capacity1000 kg
Dimension (mm)1650*990*1984
Weight (w/ Battery)825 Kg
Fork Lifting Height2049 mm
Navigation ModeL-SLAM / 3D L-SLAM
OriginChina
Safety Features: Collision Avoidance System, Emergency Stop Button, Obstacle Detection Sensors, Safety Laser Scanner.
📦
Application Cases
Deep Storage Warehouse
Conveyor Docking
Industry Highlights
Automated Storage
Stacker cranes and shuttle racks, 3,888 storage locations, 92 pallets/hour inbound/outbound flow.
Home Appliance Mfg
Deployment of 120 LMRs, 40% reduction in labor costs, 100 pallets/hour handling rate.
🛠️
Expert Services & Solutions
Providing one-stop smart factory solutions including planning, software development, automated production equipment, and AGV/AMR integration. Our services cover consulting, manufacturing of ASRS, and dedicated after-sales support.
After-Sales Support
- Standard Warranty: 12 months or 2,000 operating hours.
- Global Support: 24/7 technical assistance and spare parts supply.
- Professional Training: On-site or remote operation and maintenance training.
❓
Frequently Asked Questions
How do I select the right AMR configuration?
Selection is based on your specific operational requirements, including load weight, travel path, and environmental factors. Our technical team proposes the most suitable hardware configuration.
Is specialized software required for AMR operation?
Yes. Dedicated robot dispatching and control software is essential to work in conjunction with the AMR hardware for task management and traffic control.
Can different types of robots operate at the same site?
Absolutely. Our systems support the heterogeneous operation of multiple models (e.g., forklift robots and latent mobile robots) working together in a unified environment.
What information is needed to start a project?
We typically require your factory layout (CAD), pallet dimensions, material handling frequency, and details about existing storage systems.
What is the typical implementation timeline?
The timeline varies by project scope, but basic deployment can often be completed in as little as two weeks, while larger warehouse automation may take several months.
Who handles the commissioning and implementation?
AMR commissioning requires high-level professional expertise. Our engineering team handles all setup, mapping, and testing to ensure safe and efficient operation.